Step One:
Excavate the sea floor to permit installation over at least one foot of sound pile. |
|
 |
Step Two:
Clean the pile to produce a sound substrate. |
 |
Step Three:
Where required, install reinforcing steel and stand-offs. |
 |
Step Four:
Hang jacket from suspender ring, zip closed and secure at bottom. |
 |
Step Five:
Inject mortar through two hoses extending to the bottom of the jacket. |
 |
Step Six:
Remove hanger assembly and the job is complete. |
 |