Construction Techniques Incorporated

Ballistic Pile Jacket Installation

Follow these six steps for a fast Ballistic Pile Jacket Installation.
Click here to download our brochure.

Step One:
Excavate the sea floor to permit installation over at least one foot of sound pile.
 
Step Two:
Clean the pile to produce a sound substrate.
Step Three:
Where required, install reinforcing steel and stand-offs.
Step Four:
Hang jacket from suspender ring, zip closed and secure at bottom.
Step Five:
Inject mortar through two hoses extending to the bottom of the jacket.
Step Six:
Remove hanger assembly and the job is complete.